Program Overview

Aeris V500 · Critical-Care Ventilator · Stage: Verification

Live program telemetry
Aeris V500 · Verification phase
Waveform reflects live agent + human activity across the traceability spine
Requirements decomposed
428
+12 this week
Standards mapped
10
1 gap
Verification coverage
87%
+3.4pt
BOM saving / unit
$218
of $246 target
Verification coverage trend
By test level · nightly rollup
Compliance readiness
Weighted alignment · monthly
Program workflow
Live pipeline status · entities in stage / total
Decompose
100%
Classify
96%
Map compliance
91%
Generate tests
84%
Optimize BOM
72%
Agent activity
Live · from audit + agent runs
streaming
  • Requirement→Test Generator2 min ago
    Generated 14 proposed test cases for HW-221 (blower drive)
    HW-221
  • Verification Runner6 min ago
    TC-08840 apnea backup timing FAILED — 4.2s vs BC-06 threshold 4.0s
    REQ-1058
  • L. Okafor · Compliance Lead18 min ago
    Approved 3 boundary conditions for IEC 81001-5-1
  • CTS/CTQ Classifier (Beta)34 min ago
    Proposed CTS classification for 7 requirements — awaiting review
  • Alternate-Vendor Agent1 h ago
    Identified qualified alternate for SEN-O2-G1 (City Tech → Sensirion)
    SEN-O2-G1
  • M. Chen · Test Engineer2 h ago
    Overrode classification on REQ-0431 (CTQ → CTS) with rationale
Your approvals
Items awaiting sign-off
Open queue
  • Safety failure disposition
    REQ-1058 · TC-08840
    Apnea backup 4.2s exceeds BC-06 4.0s threshold. Recommend retest with FW 2.3.1-rc3.
  • Classification override
    REQ-0431
    Reclassify CTQ → CTS (Part 11 audit trail is safety-adjacent).
  • Compliance mapping
    IEC 81001-5-1 → SW-160
    Auto-mapped 6 requirements under §5.2 patch SLA.
  • Test case approval
    HW-221 · 14 cases
    Generated cases covering blower drive envelope + edge current profile.